Bond Buyer Club
  • Business
  • World
  • Stocks
  • Investing
  • Business
  • World
  • Stocks
  • Investing

Bond Buyer Club

Investing

Locksley Resources LimitedDrill Program Operations Commence at El Campo

by admin November 27, 2025
November 27, 2025
Locksley Resources LimitedDrill Program Operations Commence at El Campo

Perth, Australia (ABN Newswire) – Locksley Resources Limited (ASX:LKY,OTC:LKYRF) (FRA:X5L) (OTCMKTS:LKYRF) provided a significant operational update for its Mojave Project in California, confirming that the project has now transitioned into the drilling program phase.

HIGHLIGHTS

– Activities have commenced for Locksley’s maiden drilling campaign at the El Campo Rare Earths Prospect, marking the start of the high-impact exploration phase

– The required reclamation bond for the Desert Antimony Mine (DAM) has been accepted by the Bureau of Land Management (BLM), triggering full approval for the expanded drilling program

– Earthworks and drill site preparation underway at El Campo, with El Campo drilling to be followed immediately by equipment mobilisation to the DAM antimony prospect

– Back-to-back drilling programs ensure a continuous flow of exploration news and data through Q1 and Q2, 2026

– These parallel advancements clear the path for testing both high-grade REE targets (up to 12.1% TREO) and the expanded Antimony Exploration Target at DAM

Earthworks contractors have mobilised to the El Campo Rare Earths Prospect to begin drill site preparations. This marks the formal commencement of the Company’s maiden five drillhole diamond drilling program (Figure 2*).

This campaign is designed to test the down-dip continuity of the high-grade REE-bearing breccia zones and shear structures mapped and sampled at surface. The drilling will provide critical geological data to validate the exploration model and confirm the extension of mineralisation at depth.

Locksley also announced, following the end of the government shutdown, the acceptance of the required reclamation bond by the U.S. Bureau of Land Management (BLM) for the Desert Antimony Mine (DAM). This payment was the final condition precedent for the expanded Plan of Operations (POO). With the bond now in place, the DAM diamond drilling program is now fully permitted and ready for execution for up to 16 drill holes for ~2,300 metres (Figure 1*).

To maximise efficiency and reduce mobilisation costs, the Company has structured a sequential drilling campaign where the diamond drill rig at El Campo will mobilise directly to the DAM prospect upon completion of the REE program. This ensures a continuous flow of exploration news and data through Q1 and Q2, 2026, testing the high-grade potential of both strategic commodities.

Kerrie Matthews, Managing Director & CEO, commented:

‘We are finishing 2025 with strong momentum. By commencing operations at El Campo and finalising the bond for DAM, we have effectively opened two fronts for exploration. To maximise efficiency and reduce mobilisation costs, the Company has structured a sequential drilling campaign. The diamond drill rig at El Campo will mobilise directly to the DAM prospect upon completion of the El Campo REE program. This ensures a continuous flow of exploration news and data through Q1 and Q2, 2026, testing the high-grade potential of both strategic commodities’.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/UER1RS4K

About Locksley Resources Limited:

Locksley Resources Limited (ASX:LKY,OTC:LKYRF) (FRA:X5L) (OTCMKTS:LKYRF) is an ASX listed explorer focused on critical minerals in the United States of America. The Company is actively advancing exploration across two key assets: the Mojave Project in California, targeting rare earth elements (REEs) and antimony. Locksley Resources aims to generate shareholder value through strategic exploration, discovery and development in this highly prospective mineral region.

Mojave Project

Located in the Mojave Desert, California, the Mojave Project comprises over 250 claims across two contiguous prospect areas, namely, the North Block/Northeast Block and the El Campo Prospect. The North Block directly abuts claims held by MP Materials, while El Campo lies along strike of the Mountain Pass Mine and is enveloped by MP Materials’ claims, highlighting the strong geological continuity and exploration potential of the project area.

In addition to rare earths, the Mojave Project hosts the historic ‘Desert Antimony Mine’, which last operated in 1937. Despite the United States currently having no domestic antimony production, demand for the metal remains high due to its essential role in defense systems, semiconductors, and metal alloys. With significant surface sample results, the Desert Mine prospect represents one of the highest-grade known antimony occurrences in the U.S.

Locksley’s North American position is further strengthened by rising geopolitical urgency to diversify supply chains away from China, the global leader in both REE & antimony production. With its maiden drilling program planned, the Mojave Project is uniquely positioned to align with U.S. strategic objectives around critical mineral independence and economic security.

Tottenham Project

Locksley’s Australian portfolio comprises the advanced Tottenham Copper-Gold Project in New South Wales, focused on VMS-style mineralisation

Source:
Locksley Resources Limited

Contact:
Kerrie Matthews
Chief Executive Officer
Locksley Resources Limited
T: +61 8 9481 0389
Kerrie@locksleyresources.com.au

News Provided by ABN Newswire via QuoteMedia

This post appeared first on investingnews.com

previous post
Land purchased for Collie plant development
next post
Syntheia Announces Closing of Shares for Debt Transaction

Related Posts

Hudbay Secures US$600 Million Mitsubishi Partnership for Arizona...

August 15, 2025

Morocco, Emmerson Advance Toward US$2.2 Billion Arbitration Over...

August 21, 2025

Option to acquire 888km2 Au/Cu project in WA

September 4, 2025

15 Canadian Crypto ETFs in 2025

August 12, 2025

Altech Batteries Ltd$6M Placement to Advance Battery Projects

October 14, 2025

Strategic Acquisition of Aurumin Consolidates Sandstone

July 21, 2025

Apollo to Proceed with 5-for-1 Share Consolidation

September 3, 2025

Red Cloud Announces Keynote Lineup and Agenda for...

November 1, 2025

Tech Weekly: Market Dives After Week-Long Rally as...

October 11, 2025

New Rare Earths Venture to Target High-grade Assets...

August 21, 2025

    Join our mailing list to get access to special deals, promotions, and insider information. Your exclusive benefits await! Enjoy personalized recommendations, first dibs on sales, and members-only content that makes you feel like a true VIP. Sign up now and start saving!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Editors’ Picks

    • 1

      Lahontan Begins Metallurgical Test Work at Santa Fe

      June 25, 2025
    • 2

      Ben & Jerry’s co-founder resigns, claiming parent company Unilever ‘silenced’ its campaigning

      September 18, 2025
    • 3

      Nvidia CEO Huang sells $15 million worth of stock, first sale of $873 million plan

      June 26, 2025
    • 4

      Tech 5: OpenAI/Microsoft Talks Get Tense, SoftBank Floats Arizona Robotics Hub

      June 23, 2025
    • 5

      A weakened Tehran lashes out performatively against US airbases to save face

      June 24, 2025
    • 6

      Walmart to pay $10 million to settle lawsuit over money transfer fraud

      June 24, 2025
    • 7

      Joe Rabil’s Undercut & Rally Pattern: From DROP to POP

      June 23, 2025

    Categories

    • Business (155)
    • Investing (1,142)
    • Stocks (78)
    • World (136)
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 bondbuyerclub.com | All Rights Reserved